Bharatiya Antariksh Station: India’s Plan for Its Own Space Station, Explained

Bharatiya Antariksh Station India’s Space Future

Mission File Programme Bharatiya Antariksh Station (BAS) Announced 18 September 2024 Lead agency ISRO, under the Gaganyaan Programme BAS-1 budget Rs 1,763 crore First module (BAS-1) Targeted late 2028 Full station target 2035 Orbit 400 to 450 km, about 51.5 degree inclination Crew capacity 3 to 4 (up to 6 for short stays) In This … Read more

Chandrayaan-4: India’s Mission to Bring Moon Rocks Back to Earth

India’s Mission to Bring Moon Rocks Back to Earth

Chandrayaan-4 is ISRO’s ambitious lunar sample-return mission, designed to collect 2–3 kg of Moon rocks and soil and bring them safely back to Earth. Targeted for 2028, the mission will use two LVM3 launches, orbital docking, a lunar lander and ascender, and an Earth re-entry module making it India’s most complex Moon mission yet.

What Is Aditya-L1? ISRO’s Solar Mission Explained

What is Aditya-L1?

Mission File Developed by ISRO Launched Sept 2, 2023 Vehicle PSLV-C57 Location Sun–Earth L1 point Distance ~1.5 million km Orbit Halo orbit (since Jan 2024) Payloads 7 instruments Mission life ~5 years In This Article What Is Aditya-L1? Why Did ISRO Launch a Solar Mission? How Does Aditya-L1 Study the Sun? Why Is Aditya-L1 Important? … Read more

What is GSLV? India’s Powerful Rocket Explained for Beginners (2026)

GSLV rocket

Discover everything about GSLV, India’s powerful Geosynchronous Satellite Launch Vehicle. Learn how it works, why its cryogenic engine is a breakthrough, its three-stage design, major ISRO missions, and how GSLV differs from PSLV—all explained in simple language for students, beginners, and space enthusiasts.