NVS-03 Explained: The Indigenous Atomic Clock Bringing NavIC Back to Life (2026)

NVS-03 explained: an NVS-series NavIC satellite undergoing pre-launch preparation in ISRO's cleanroom, the same design lineage as NVS-03

Mission File Satellite NVS-03 (IRNSS-1L) Launch vehicle GSLV-F18 Launch window October 2026 Launch site SDSC SHAR, Sriharikota Mass 2,232 kg Target orbit Geosynchronous, 129.55°E Atomic clock Indigenous Rubidium (iRAFS) Design life 12 years In This Article What Is NVS-03 and Why Does It Matter? The Atomic Clock Story: From Swiss Failure to Indian Comeback Inside … Read more

GSLV vs LVM3: Why ISRO Is Retiring One Rocket to Bet on the Other (2026)

GSLV vs LVM3 comparison: GSLV Mk II rocket lifting off carrying the NISAR satellite

Quick Comparison GSLV payload (GTO) About 2,500 kg LVM3 payload (GTO) About 4,200 kg GSLV cost per launch Roughly Rs 390 to 400 crore LVM3 cost per launch Roughly Rs 400 to 405 crore GSLV first flight 2001 (Mk I), 2010 (Mk II) LVM3 first flight 2017 GSLV flights so far 20, with 14 fully … Read more

PSLV vs SSLV: How India’s Two ISRO Rockets Actually Compare (2026)

PSLV rocket lifting off from Sriharikota, the workhorse launch vehicle in the PSLV vs SSLV comparison

Quick Comparison PSLV payload (Sun synchronous orbit) 1,100 to 1,750 kg, depending on variant SSLV payload (Sun synchronous orbit) About 300 kg, rising to near 390 kg after its 2025 upgrade PSLV cost per launch Roughly Rs 130 to 200 crore SSLV cost per launch Roughly Rs 30 to 35 crore PSLV first flight 1993 … Read more

PSLV-C62 Failure: What Went Wrong With ISRO’s Rocket Launch

The PSLV-C62 failure

Mission File Mission PSLV-C62 / EOS-N1 Launch date January 12, 2026, 10:17 hrs IST Site Satish Dhawan Space Centre, Sriharikota Vehicle PSLV-DL (64th PSLV flight) Payloads EOS-N1 + 15 co-passenger satellites Failed stage Third stage (PS3) Cause Roll-rate disturbance, propulsion instability Status Fix validated, PSLV cleared to fly again In This Article What Was PSLV-C62 … Read more

What Is Aditya-L1? ISRO’s Solar Mission Explained

What is Aditya-L1?

Mission File Developed by ISRO Launched Sept 2, 2023 Vehicle PSLV-C57 Location Sun–Earth L1 point Distance ~1.5 million km Orbit Halo orbit (since Jan 2024) Payloads 7 instruments Mission life ~5 years In This Article What Is Aditya-L1? Why Did ISRO Launch a Solar Mission? How Does Aditya-L1 Study the Sun? Why Is Aditya-L1 Important? … Read more

What Is a Cryogenic Engine? ISRO’s Rocket Technology Explained

Editorial illustration of a cryogenic rocket engine using liquid hydrogen and oxygen in an Indian launch vehicle.

Engine File Developed by ISRO (LPSC) Programme CUSP Engine CE-7.5 Propellants Liquid H2 + Liquid O2 Cycle Staged combustion Used in GSLV Mk II upper stage Inducted GSLV-D5, Jan 2014 Status Operational In This Article What Is a Cryogenic Engine? Why Were Cryogenic Engines Developed? How Does a Cryogenic Engine Work? Why Is a Cryogenic … Read more

Vyommitra: ISRO’s Robotic Astronaut Explained

Editorial illustration of Vyommitra, ISRO’s robotic astronaut, inside an uncrewed Gaganyaan spacecraft

Robot File Developed by ISRO Programme Gaganyaan Type Semi-humanoid robot Name meaning Vyoma (space) + Mitra (friend) Build Head, torso, two arms Role Cabin & life-support test passenger Coordinating body Human Space Flight Centre Precursor flight announced 2024 In This Article What Is Vyommitra? Why Did ISRO Develop a Robotic Astronaut? How Does Vyommitra Work? … Read more